MONITORING AND LABORATORY TESTING
Uranium monitoring
2013-2016
Public Limited Company for Radioactive Waste Management Ltd.
$ 848.000
-
Operation of long term hydrogeological
-
Radiological and environmental monitoring system of former Hungarian uranium mines
Services provided:
-
• Water, soil, waste sampling
-
Radiological measurements in fields, laboratory measurements (chemical, radiological, geotechnical)
-
Water level measuremenets, geodesy, surveying, evaluation from experts and designers
Gyöngyösoroszi monitoring
2013-2015
Mecsek-Öko Ltd.
$ 580.000
-
Operation of hydrogeological, geotechnical and environmental monitoring system of former Hungarian Cu-Pb mines Gyöngyösoroszi, Recsk during the mine closure activity
Services provided:
-
Water, soil, waste sampling
-
Laboratory measurements (chemical, geotechnical)
-
Water level measurements, evaluation from experts and designers
BAF (Boda Claystone Formation) monitoring
2011-2014
Public Limited Company for Radioactive Waste Management Ltd.
$ 1.070.000
-
Geological research of the Boda Claystone Formation (BAF) for the final disposal of the high level radioactive waste from nuclear power plant
-
Operation of hydrogeological, radiological, monitoring system
Services provided:
-
Water sampling
-
Laboratory measurements (chemical, radiological)
-
Water level measurements, data logger operation
-
Evaluation from experts and designers